⚡ 20MW

Etsome Solar Park

O V E R V I E W

Etsome Solar Park, on land directly east of Somerton Door Drove, Somerton, TA11 6JN, is a circa 20MW Solar Park developed by Gridsource, in partnership with Sky UK Developments Limited from first principles.

C O M M U N I T Y  C O N SU L T A T I O N

We have now submitted a full planning application for Etsome Solar Park to Somerset Council, and we are committed to ensuring that the local community are informed and fully understand the plans for the project.

Details regarding the community consultation event, our proposals and engagement can be found at https://assetface.com/etsomesolarpark

W HA T  A R E  S O L A R   F A R M S  A N D  W H Y  A R E  T H E Y  N E E D E D ?

Solar Farms use photovoltaic (PV) panels, harness the sun’s energy and convert it into electricity that is sent to the electrical grid for distribution and consumption.

A solar farm of this size will generate a significant amount of electricity from renewable sources, therefore offsetting the need for power generation from the combustion of fossil fuels including coal and oil. Consequently, during its operational lifespan the proposed development has the potential to displace electricity generated from fossil fuels and consequently represents carbon savings.

Solar farms assist with the transition to a low carbon energy grid with improvements to the local environment and looks to address the Climate Emergency and the UK’s Net Zero by 2050 commitments.

 

 

 

 

 

 

 

 

 

SHARE DEVELOPMENT
Project

Etsome Solar Park

Location

Somerton, UK

Type

Solar

Capacity

20MW

Connection Voltage

33,000V

Status

Planning Submitted